  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  2. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous. C. It can save both time and money. D. It means less mechanization.

  3. According to the passage, the principle of system building is that_______.

  A. construction methods are safer  B. buildings are made from a set of standardized units

  C. similar buildings can be produced  D. all units are produced on the site

  4. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters  C. fifty centimeters D. ten centimeters

  5. What lifts the concrete panels onto the building?

  A. Cranes. B. Man-power.  C. Pulleys. D. Hydraulic jacks.

  參考答案: A C B D A

  

  68

  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  2. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous. C. It can save both time and money. D. It means less mechanization.

  3. According to the passage, the principle of system building is that_______.

  A. construction methods are safer  B. buildings are made from a set of standardized units

  C. similar buildings can be produced  D. all units are produced on the site

  4. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters  C. fifty centimeters D. ten centimeters

  5. What lifts the concrete panels onto the building?

  A. Cranes. B. Man-power.  C. Pulleys. D. Hydraulic jacks.

  參考答案: A C B D A

  

信息流廣告 周易 易經(jīng) 代理招生 二手車 網(wǎng)絡(luò)營銷 旅游攻略 非物質(zhì)文化遺產(chǎn) 查字典 社區(qū)團購 精雕圖 戲曲下載 抖音代運營 易學(xué)網(wǎng) 互聯(lián)網(wǎng)資訊 成語 成語故事 詩詞 工商注冊 注冊公司 抖音帶貨 云南旅游網(wǎng) 網(wǎng)絡(luò)游戲 代理記賬 短視頻運營 在線題庫 國學(xué)網(wǎng) 知識產(chǎn)權(quán) 抖音運營 雕龍客 雕塑 奇石 散文 自學(xué)教程 常用文書 河北生活網(wǎng) 好書推薦 游戲攻略 心理測試 石家莊人才網(wǎng) 考研真題 漢語知識 心理咨詢 手游安卓版下載 興趣愛好 網(wǎng)絡(luò)知識 十大品牌排行榜 商標交易 單機游戲下載 短視頻代運營 寶寶起名 范文網(wǎng) 電商設(shè)計 免費發(fā)布信息 服裝服飾 律師咨詢 搜救犬 Chat GPT中文版 經(jīng)典范文 優(yōu)質(zhì)范文 工作總結(jié) 二手車估價 實用范文 古詩詞 衡水人才網(wǎng) 石家莊點痣 養(yǎng)花 名酒回收 石家莊代理記賬 女士發(fā)型 搜搜作文 石家莊人才網(wǎng) 鋼琴入門指法教程 詞典 圍棋 chatGPT 讀后感 玄機派 企業(yè)服務(wù) 法律咨詢 chatGPT國內(nèi)版 chatGPT官網(wǎng) 勵志名言 河北代理記賬公司 文玩 語料庫 游戲推薦 男士發(fā)型 高考作文 PS修圖 兒童文學(xué) 買車咨詢 工作計劃 禮品廠 舟舟培訓(xùn) IT教程 手機游戲推薦排行榜 暖通,電地暖, 女性健康 苗木供應(yīng) ps素材庫 短視頻培訓(xùn) 優(yōu)秀個人博客 包裝網(wǎng) 創(chuàng)業(yè)賺錢 養(yǎng)生 民間借貸律師 綠色軟件 安卓手機游戲 手機軟件下載 手機游戲下載 單機游戲大全 免費軟件下載 石家莊論壇 網(wǎng)賺 手游下載 游戲盒子 職業(yè)培訓(xùn) 資格考試 成語大全 英語培訓(xùn) 藝術(shù)培訓(xùn) 少兒培訓(xùn) 苗木網(wǎng) 雕塑網(wǎng) 好玩的手機游戲推薦 漢語詞典 中國機械網(wǎng) 美文欣賞 紅樓夢 道德經(jīng) 標準件 電地暖 網(wǎng)站轉(zhuǎn)讓 鮮花 書包網(wǎng) 英語培訓(xùn)機構(gòu) 電商運營
主站蜘蛛池模板: 亚洲成人黄色网址| 91理论片午午伦夜理片久久 | 精品人妻系列无码一区二区三区 | 久久久男人天堂| 成人乱码一区二区三区AV| 中文在线天堂网www| 免费又黄又爽的视频| 国产精品久久久久久亚洲小说| 无码精品人妻一区二区三区影院| 午夜伦伦影理论片大片| 中文字幕日韩一区二区三区不卡| 亚洲综合无码AV一区二区| 国产欧美视频一区二区三区| 成人精品视频一区二区三区| 欧美激情综合网| 美女极度色诱视频国产| youjizz国产| xvideos永久免费入口| 五月婷婷综合色| 免费无码又爽又刺激毛片| 国产激情无码视频在线播放性色| 成人中文精品3d动漫在线| 最近2019中文字幕无吗| 理论片yy4408在线观看| 黄瓜视频官网下载免费版| a级毛片免费全部播放无码| 久久久亚洲精品视频| 亚洲人成在线播放网站| 国产真实伦视频在线视频| 夜夜高潮夜夜爽国产伦精品| 成人国产永久福利看片| 日韩精品无码一区二区视频| 韩国福利一区二区美女视频 | 国产CHINESE男男GAYGAY网站| 国产麻豆精品手机在线观看| 日日夜夜天天操| 日韩一本二本三本的区别青| 永久免费无内鬼放心开车| 精品精品国产欧美在线观看 | 久青草影院在线观看国产| 亚洲香蕉久久一区二区|